Recent Projects

Lube Plant Expansion (2014)

Lube Plant Expansion

20 New Carbon and Stainless Steel Tanks


See full project

New API 650 Tanks and Foundations (2015)

New API 650 Tanks and Foundations

Two API 650 CS Tanks with Ring Wall Foundations


See full project

Multi Year - Multi Tank Projects (2013 - 2015)

Multi Year - Multi Tank Projects

Multi year new tank projects.


See full project

ExxonMobil Tank Maintenence Program (2011)

Multi-site, multi-year agreement continuous service since the 1980’s


See full project

Dow Duplex Stainless 2205 Tank (2010)

Dow Duplex Stainless 2205 Tank

Pala field fabricated this duplex stainless tank and erected into place to minimize process unit disruption.


See full project

Multi Tank Project - Carbon and Stainless (2007)

Pala performed this multi tank project for the Dow major projects group


See full project

GH-101 Gas Holder Project (2006)

Repair ammonia recovery bladder – one of five in the world.


See full project

Cornerstone / Capstone Projects (2006)

Successful multi-tank project for Dow in Taft, LA and Plaquimine, LA


See full project

Repair tank 674 (2005)

New client, successful project against the backdrop of craft shortages due to hurricanes


See full project

Repair Tank 1086 (2004)

Replace large floating roof


See full project

Tank V-1905 Seal (2004)

In service seal replacement


See full project

Lift and Repair Tank (2003)

Lifted a 140 ‘ x 56′ tall tank 8’ above the ground to save time and money


See full project

Michoud Facility (2013)

Replacement of Sewer Force Main Pipe


See full project

12" Natural Gas and 14" Steam Lines (2014)

Installation of new 12″ NG and 14″ Steam Lines.


See full project

GHT Depentanizer Reconfiguration (2009)

GHT Depentanizer Reconfiguration

Construction of a unit retrofit to meet EPA Benzene standards


See full project

NASA's Michoud Assembly Facility Final Asembly (2007)

NASA's Michoud Assembly Facility Final Asembly

Schedule driven piping-installation in one of the largest manufacturing facilities in the world


See full project

Alma | Cinclaire Revamp Project (2006)

Dismantle and relocate sugar mill equipment to increase capacity


See full project

Feliciana Pipeline Logistics (2006)

Time sensitive refinery tie in to critical pipeline


See full project

Motiva Convent wet gas scrubber (2006)

Motiva Convent wet gas scrubber

Complete critical capital project when others could not


See full project

OSBL Piping for Ultra Low Sulfur Diesel (2006)

OSBL piping and tie ins to units while in operation


See full project

Waste Heat Boiler Offsite Fabrication (2002)

Waste Heat Boiler Offsite Fabrication

Fabricate and transport two large boiler modules


See full project

Formaldehyde Plant (2000)

Formaldehyde Plant

ABC Eagle Award 2000 Design Build New Plant


See full project